The goal of this project was to repair and resurface 8500 square feet of concrete around a fueling station. The original surface was ponding and the finish had deteriorated substantially. The work took place over five days at the beginning of November at the South Country Co-Op Cardlock, in Bassano Alberta. Temperatures were -2C to -12C at night, with daytime highs of 2C to 6C. MG-KRETETM was used to shotblast the cure and seal off the concrete, then resurfaced after ponding areas were filled. This project was completed by Lajcon Concrete Distributors Ltd. (Saskatoon).