Gas/Service Stations, Stadiums, Piers, Decks | MG-KRETE Before & After Repairs: Airports, Gas/Service Stations, Stadiums, Piers, Decks June 29, 2021 by Administrator Pearson Airport – Structural Repairs – Before. Chlorides and moisture were causing delamination and cracking in the parking garage column bases.Pearson Airport – After. MG-KRETE™ was used to rebuild the columns providing long-term structural repairs as well as chlorides and moisture resistance.Buffalo Bills Stadium – Aislway Patch – Aisleways from the concessions to seating were worn, spalled and experiencing cracking.Buffalo Bills Stadium – MG-KRETE™ was used to patch spalling, repair cracks and even out trip hazards.Overlay Pier Restoration – Harsh winters and environmental contaminants were causing the concrete surface of this pier to spall and break down.Overlay Pier Restoration – MG-KRETE™ overlay restored the surface and provides long-term protection.Marina Pier, Sweden – Before – Salt water combined with harsh winters was causing the concrete surface of this pier to spall.Marina Pier Sweden – Conventional overlay materials that were used to fix the surface debonded creating a worse problem than was present originally. MG-KRETE™, which is salt, water and freeze-thaw resistant, was used to overlay the entire pier bonding exceptionally well to solve their overlay and spalling problem. The cool set characteristics of the MG-Krete allowed work to progress despite large fluctuations in temperature while the job was being performed.Tormont Service Bay, London – Excessive wear from tractor treads was creating an unsafe work environment. MG-KRETE™ overlay restored the surface and resists the wear.TTC Subway Station Toronto – Deteriorated platforms needed to be rebuilt with minimal downtime. MG-KRETE™ was used to rebuild the platform surfaces behind the edge safety tiles. Zero-shrink and a very hard surface the platforms could be opened to traffic an hour after the MG-KRETE placement.